- February 2024
- Design & Engineering
Lot c-217 Casita - La Ribera, BCS
The design of this home began in June 2023. A building license was issued on February 15th, 2024, and construction began with the casita first.
Below you can take a look at our featured and recent projects.
The first construction project is Lighthouse Point Estates Lot C-217 casita. Followed by the main house for Lot C-217.
The design of this home began in June 2023. A building license was issued on February 15th, 2024, and construction began with the casita first.
Grading of the lot was completed and forms for footings were installed over high-density poly ethylene (HDPE).
Beginning with the Casita, footings were poured, and slab walls began. These slab walls hold the concrete slab in place.
Casita slab is being poured with structural steel in place.
Beginning with the Casita, footings were poured, and slab walls began. These slab walls hold the concrete slab in place.
Interior and exterior walls and roof completed. Opening headers are supported while concrete cures.
Exterior walls primed and ready for paint and windows.
Exterior walls primed and ready for paint and windows. Back side view.
Interior and exterior walls painted. Windows and sliding glass doors installed.
The main house for Lighthouse Point Estates Lot C-217 is below. From structural engineering to completed design and build.
The design of this home began in June 2023. A building license was issued on February 15th, 2024, and construction began.
Grading of the lot was completed and forms for footings were installed over high-density poly ethylene (HDPE).
Beginning with the Casita, footings were poured, and slab walls began. These slab walls hold the concrete slab in place.
Casita slab is being poured with structural steel in place.
Beginning with the Casita, footings were poured, and slab walls began. These slab walls hold the concrete slab in place.
Interior and exterior walls and roof completed. Opening headers are supported while concrete cures.
Exterior walls primed and ready for paint and windows.
Exterior walls primed and ready for paint and windows. Back side view.
Interior and exterior walls painted. Windows and sliding glass doors installed.